Drying time is a scheduling input
Different surfaces dry at very different rates, and the same surface behaves differently depending on ventilation and the weather. A sealed vinyl corridor with air movement clears quickly; the same vinyl in a closed room with the air conditioning off does not. Treating drying time as a fixed number rather than a condition of the site is how wet floors end up in front of patients.
The practical approach is to establish how much time the suite actually has. If the cleaner finishes at seven and the doors open at eight, there is an hour, and the sequence can be built to give the most exposed floors the whole of it. If the gap is fifteen minutes, morning floor work is not viable and the schedule needs to say so rather than attempt it.
